Friday 4 May 2012

Friday 16 March 2012

Evaluation: Part 2


Friday 9 March 2012

Blue Screen Effects

These are some of the blue/green screen videos i got from Youtube to use on our video:

 

Monday 5 March 2012

Filming last scenes in the studio

These are some of the clips from when we filmed in the studio and then found our that we couldn't use the blue screen because our white balance wasn't turned on on the camera and ended up making our lead singer look yellow and the background look grey.

Saturday 25 February 2012

Lyric sheet

This is the lyric sheet which I have annotated what to do for each part of the song:






Friday 3 February 2012

Editing our photos for digipak

Friday 27 January 2012

Editing our photos for magazine advert using photoshop

Tuesday 24 January 2012

Editing our open scene on Final Cut Pro

Here are a few print screens of my group editing our opening of our music video which is the filming on the bus.


This first image is of our first opening scene which is on the bus. I've edited in the scene which I then cut to where the scene ends so that the next scene can be added.


We decided to have images of the singer having fun which we have edited in between each scene of the music video. These images will appear often when when the chorus of the song appears. We also added an effect in between the scene and the first image because when we played the scene, the jump cut to the images didn't fir in with the song. The effect we had was a fading to next scene effect which is called additive dissolve. The effect worked really good with the music video as it slowly fades the scene to the photos. I then added a few more images being in jump cuts which gave the effect of the images being one after the other and fading out.


We then added the real audio by locking our film and deleting the audio we had from the our filming and then dragging the actual music of the song to the editing panel.

Saturday 21 January 2012

Back Stage of first day of shooting

These are the images we took while we were filming on the bus we hired for our opning scene of our music video. The images contain the cast and crew preparing for filming. The images show the cast practicising their routines and making their way to their position for filming as well as me and my project partner giving directions.


Lead Singer




Cast practicing dance routine








Sunday 15 January 2012

Back Drop



We want a back drop for the filimg we do in the studio and thought we'd use a monnlight back drop because in the lyrics the word moonlight is used so we thoguht it would be a great idea to use a back drop like that as well as finding a monnlight that moves or have glitter falling in animation to match it to the lyrics.


My partner and I searching for a moonlight back drop.


This is our chosen back drop of a moonlight night.

Wednesday 11 January 2012

Filming Schedule

Day
Time
Process

Monday 16th
1:15pm
Filming our opening scene on the bus we hired.

Tuesday 17th
8:50am
Filming in the studio

Friday 20th
1:15pm
Filming around south Norwood

Monday 23rd
1:15pm
Filming and taking photos for music video and digipak

Tuesday 10 January 2012

Reckie

The term reckie for photographers, videographers and film makers is when they go take a look at potential sites for their shoots. This helps them to know what the lighting looks like at different times of the day, sound quality of the place, noise levels and what equipment they'll need to bring and where the electrical outlets are.

This is a reckie of all the locations we have decided to use for our music video which are the studio at college, the bus and out side.


This is the reckie for the studio which we will be using to shoot our photo shoot and the bridge of our song. The noise level in the studio is very low so no disruptions will interrupt the filming. The lighting is very low but there are lights hanging from the ceiling from either sides. Only a HD camera will be needed for this location as there are lights already here.



This is the reckie for the bus for our opening scene. For the bus scene we couldn't take a light because there are no electrical outlets as well as it being a small area to film in but we were using a HD camera which had high key lighting on helping brighten the scene up for filming.


Here in this image you can see that the high key lighting has helped brighten up the image unlike the image above. The bus was in a secluded are where Mayday bus service keep all their coaches so it helped to film as there were no noises.

Location Shots

Here are our location shots which are the places we've decided to film for our music video. the first image is of the bus we've hired to shoot our opening scene and the second image is of the studio at out college which we will be filming the bridge of the song as well as other scenes in between and the photos for our digipak and magazine advert.


Monday 9 January 2012

Lead Singer Practicing Lip Singing for Video

Here is a video of our lead singer practicing her lip singing and dancing, getting ready before we start our actual filming.

Saturday 7 January 2012

Cast and Crew

These are the list of cast and crew for our music video:

 Lead singer


Ayesha is both a back up dancer and a crew member.

AJ is a back up dancer.


Yinka is a back up dancer

Auditions for cast




Thursday 5 January 2012

Magazine Advert Template

For our Music video we have to create a magazine advert so we chose Q Magazine and here we have drawn up an idea of how the front cover will be laid out. We chose to have the whole cover of the magazine covered with an image of our singer from the waist above holding the letters that make up the word Domino.



Me drawing up our ideas for our magazine cover.

Tuesday 3 January 2012

Digipack templates

These are some drawing ideas of images that that we might take for our 6 sided digipak where our CD will be inside. The images contain the singer in different poses which will both be from the photo shoot and the music video.





Thursday 29 December 2011

Dilemma

Dilemma!
We had a dilemma during the Christmas holidays because the artist we are doing, Jessie J, had just released the music video for the song we are doing. However because her video is a performance where she is singing in from of a green screen we discussed that we should continue on to do the song because our video is more along the lines of a story as well as performance.



We looked at the video and saw that some of the dance moves were really nice so thought we'd use them but change them around and add more dances to them.

Sunday 18 December 2011

Diary Entry

During class we were told that we had to do a recky and a risk assessment which are photos of our locations along with risk hazards that might occur during filiming. We had to do these because it helps to analyse the pros and cons of the locations as well as solving the problems so that when it comes to filming we are prepared and have notified everyone of what the risks are.

Thursday 15 December 2011

Diary Entry

Dilemma!
We forgot to talk to a bus company to hire out a bus for 1 or 2 hours so that we can film the opening of our music video so we looked up some places on the internet and found a website where you can hire out old fashioned buses so we called them up in lesson. I gave all the details of when we wanetd to hire the bus and the the man gave us a quote of £378 which was way out of our budget seeing as we are filming for our music video and we dont have money to spend.

Our office teachers over heard our conversation and asked us what we needed a bus for whichwe explained and they said they can help us out as Harris Southnorwood has contact with Mayday bus company near Vally Park, Purley which they hire out bus for trips. They said they can organise it for us and that the inside of the coatches look like the inside of the red London buses which they were suuccessful in by getting us a slot on Friday 13th January at 1:30, which was when all our crew finished 6th form and also they many that owns the place hired the coatch out to us for free which was a great relief as we didnt have to spend any money. Also on top of that the man said he will also pcik us up and drop us back with his mini bus.


One of the office teachers who set us up with the MayDay buc service

However, we had a big problem as a few people including my parnet had an exam at 1:15 on that Friday so I had to go speak to the office teachers the next day to tell them the bad news and hopefully they could arrange another filming day which they did for Friday 20th of January.